CLAY COUNTY SR-53 bridge repair over Dry Fork Creek (LM 1.3) and Mill Creek (LM 2.5): The contractor will continue work on Phase 2 and the southbound lane will remain open. The northbound lane will remain closed and a temporary signal system will be used to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution and be prepared to stop while approaching the work zones located at LM 1.35 and 2.50. The estimated completion date on this contract is 06/30/21. RESTRICTIONS: Loads wider than 11' should seek alternate route.

[Mid-State Construction Company, Inc./Moore/CNU198]

CUMBERLAND COUNTY I-40 repair of the bridges over SR-1 (US-70) at MM 328.5: During this period, westbound and eastbound I-40 near MM 328 will have no scheduled lane closures. SR-1 (US-70) will be reduced to one lane with traffic signals near LM 24 at Crab Orchard, TN for bridge repair. Motorists should exercise caution and pay attention to the temporary traffic signals as they travel through the work zone.

[Mid-State Construction Company, Inc./Bradley/CNU145]

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): Construction signs have been installed with erosion control and clearing activities in progress. Utility relocation for the gas line is in progress. Temporary lane closures or traffic stoppages will be necessary as construction activities continue. Motorists should use caution while traveling through the work zone.

[Jones Bros. Contractors, LLC/Bradley/CNV009]

CUMBERLAND COUNTY SR-1 (US-70) paving near Arthur Seagraves Road (LM 2.5) to near Woodridge Lane (LM 6): The contractor will be performing safety-related construction activities including installation of permanent sign and pavement marking between Arthur Seagraves Road and Woodbridge Lane on SR-1 (US-70). These activities may require lane closures or traffic stoppages. Construction signs will be installed, and flaggers will be present to direct traffic when needed.

[Rogers Group, Inc./Bradley/CNU919]

CUMBERLAND COUNTY SR-101 (Peavine Road) grading, drainage, and paving from Firetower Road to Westchester/Catoosa Boulevard: Motorists should use caution while driving along Peavine Road. The posted speed limit from I-40 to Tuttle Lane is now 45 MPH. The existing speed limit within Fairfield Glade remains at 30 MPH. The newly installed traffic signals at Stonehenge and Eagle Lane will be in operation. Temporary lane closures and/or traffic stoppages may be needed as paving driveways, pavement markings, traffic signal work, and other construction activities continue. Motorists should reduce speed on Peavine Road and be alert for construction personnel/equipment entering and exiting the roadway.

[Rogers Group, Inc./Bradley/CNQ921]

DEKALB COUNTY SR-26 (US-70) construction from near SR-53 (LM 2) to near SR-96 (LM 6.1): Contractor has begun clearing operations and installing erosion control measures. Intermittent lane closures and flagging operations are expected. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.

[Twin K Construction/James/CNV012]

DEKALB AND WARREN COUNTY SR-56 construction of bridges and paving from south of Warren-Dekalb county line (LM 24.5) to East Bryant St. (LM 2.9): The contractor will continue installing concrete box culverts and drainage structures. Grade work, bridge work, paving operations, and utility work on the new roadway alignment are ongoing. Traffic is still using the existing SR-56; however, motorists are advised to use caution and watch for construction equipment adjacent to roadway. Flaggers may be present to move equipment across roadway, unload equipment, or complete utility work. The contractor currently performing grade work inside Smithville City Limits between Dearman Street and East Bryant Street. A traffic shift in this area will remain to allow contractor to complete work. A diversion remains in place for Williams Road to allow contractor to construct new alignment. The speed limit has been reduced to 45 mph in the construction zone. Motorists should use caution in this area and watch for flaggers and construction equipment.

[Jones Bros. Contractors, LLC/Harris/CNT011]

JACKSON COUNTY SR-85 (YORK HWY.) TDOT Maintenance westbound from LM 24.2 to LM 24.5: TDOT Maintenance westbound from LM 24.2 to LM 24.5: SR-85 is reduced to one lane with temporary signals from LM 24.2 to 24.5. This will remain in effect until slope stabilization work completion which is estimated to be 06/30/21.

PUTNAM COUNTY I-40 resurfacing from east of SR-56 (MM 281) to west of SR-136 (MM 287): Contractor will be performing nightly lane closures Sunday through Thursday from 7 PM - 6 AM. Work will consist of milling and paving operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.

[Rogers Group, Inc./James/CNV029]

PUTNAM COUNTY SR-135 (Burgess Falls Road) grading, drainage, signals and paving at the intersection of West Cemetery Road (LM 6.6): Contractor continues their roadside grading operations and will be finishing their 10 day road closure of West Cemetery Road from the intersection of SR-135 to Cherry Creek Electric Company. A signed detour is in place during this time via Belmont Drive and Churchill Drive. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.

[Rogers Group, Inc./James/CNU270]

PUTNAM COUNTY SR-24 (US-70N) slide repair near LM 30.1: The contractor has installed barrier rail and began excavation work. Traffic will be reduced to one lane and controlled by temporary traffic signals at each end of the project. Be prepared to stop when traveling through the work zone.

[Rogers Group, Inc./James/CNU359]

 

DISTRICT 28

BLEDSOE COUNTY SR-30 slope stabilization at LM 12.5: Roadway is reduced to one lane. Traffic is controlled by signals.

[TDOT/Miner/MAINT]

BLEDSOE COUNTY SR-28 (US-127) paving from north of Harvey Lewis Drive (LM 21.8) to the Cumberland County line (LM 29): The contractor will be resurfacing on US 127 (S.R. 28) from Harvey Lewis Drive to the Cumberland County Line. The roadway will be reduced to one lane controlled by a flagging operation when workers are present. Please use caution when traveling through the area.

[Asphalt Paving Systems, Inc./Voiles/CNV002]

BLEDSOE COUNTY SR-30 bridge repair over the Sequatchie River (LM 10.36): The contractor will be working on SR-30 on the bridge over the Sequatchie River. The road will be reduced to one lane controlled by a traffic signal while repairs are made. Please use caution when traveling through the area. RESTRICTIONS: Loads wider than 15' should seek alternate route.

[Jamison Construction, LLC/Voiles/CNV003]

COFFEE AND GRUNDY COUNTY The resurfacing on I-24 from east of Rutledge Hill Road (LM 28.93) in Coffee County to east of the Bells Mill Road bridge (LM 2.45) in Grundy County, including bridge repair: Project activity will continue from 7 PM to 6 AM. The roadway will be reduced to one lane nightly both directions to support operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone and be prepared to reduce speeds while approaching the work zone located between Coffee County LM 28.93 to Grundy County LM 2.45, the posted speed limit has been reduced from 65 MPH to 55 MPH within the work zone.

[Rogers Group, Inc./Hussein/CNU339]

FRANKLIN COUNTY SR-15 (US-41) intersection improvement at University Avenue (LM 27.9): Project activity will continue daily. The roadway will be reduced from 4-lanes to 2-lanes. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.

[Dement Construction Company, LLC/Hussein/CNV062]

FRANKLIN COUNTY SR-50 construction of a small drainage structure at (LM 7.6): Project activity progression will continue daily. The roadway will be reduced to one lane controlled by traffic signal operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone and be prepared to stop while approaching the work zone located at LM 7.6, the posted speed limit has been reduced from 40 MPH to 25 MPH within the work zone.

[Dement Construction Company, LLC/Hussein/CNV062]

FRANKLIN, COFFEE, AND GRUNDY COUNTY SR-50 (US-64) resurfacing from west of Rutledge Ford Rd (LM 21.4) in Franklin County, through Grundy/Coffee County to near I-24 (LM 0.2) in Grundy County: Project activity progression will continue daily. The roadway will be reduced to two lanes during construction work, all 4 lanes will be restored by the end of each day. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.

[Tinsley Asphalt, LLC /Hussein/CNV015]

GRUNDY COUNTY SR-56 slide repair between LM 26.3 and LM 26.6: The road will remain one lane controlled by a temporary traffic signal while contractor completes slide repairs in the area. Motorists should use caution in the area and watch for flaggers and equipment.

[Dement Construction Company, LLC/Harris/CNU355]

MARION COUNTY I-24 westbound MM 166 to MM 167 slope stabilization: Right Shoulder closure from mile 167 to 166.4 West bound direction of I-24. Traffic Control signs are installed notifying of the shoulder closure.

[GeoStabilization International, LLC /Miner/MAINT]

MARION COUNTY I-24 TDOT Bridge Maintenance eastbound at MM 166.4: Bridge Maintenance will be performing night time bridge maintenance on the bridge on I-24 at MM 166.4 on Thursday, 6/24/21, from 9 PM until 3 AM. Traffic control will be in place for this project.

MARION COUNTY I-24 TDOT Maintenance westbound from MM 166.6 to MM 165: Single lane closure will begin at 6PM Central on Thursday 06/24/21 and end on Friday 06/25/21 at 6AM Central between the GA State Line and mile 165 going west bound. Traffic control will be in place.

MARION COUNTY SR-27 (US-HWY. 72) TDOT Bridge Maintenance both directions at LM 3.95: Bridge Maintenance will be repairing the joints at the bridge on SR-27 over Battle Creek at MM 3.95 on Monday, 6/28/21, through Tuesday, 6/29/21, from 8 am until 3 pm. Traffic control will be in place for this project.

SEQUATCHIE COUNTY SR-8 (US-127) repair of bridge over the Sequatchie River (LM 12.7): The contractor will be working on SR-8 on the bridge over the Sequatchie River. The road will be reduced to one lane controlled by a traffic signal while repairs are made. Please use caution when traveling through the area. RESTRICTIONS: Loads wider than 15 feet should seek alternate routes.

[Southern Constructors, Inc./Voiles/CNU148]

VANBUREN COUNTY SR-111 resurfacing from Sequatchie County line (LM 0) to north of Feedstore Drive (LM 12.5): The contractor has begun resurfacing operations on SR-111 from the Sequatchie County line to Log mile 12.51 in Van Buren. One lane will be closed while resurfacing operations are taking place. Please use caution when traveling through the area.

[Strawser Construction, Inc./Voiles/CNU298]

 

DISTRICT 29

BRADLEY COUNTY SR-2 (KEITH ST. S.W.) Utility Work southbound from LM 8.57 to LM 9.24: Lane closures between Fairway Drive SW and Harrison Pike. Signage and barrels will be present. Motorists should reduce speed and use caution through the work zones between the hours of 9 am - 2 PM during the daytime and 8 PM - 6 AM during the nighttime. [2020-423/424]

BRADLEY COUNTY SR-312 (HARRISON PK.) Utility Work both directions from LM 8.48 to LM 8.42: A detour of Harrison Pike at Keith Street will cause short delays as traffic is routed along Grove Avenue during utility construction. Motorists should reduce speed and follow signage. Barricades, cones, and flaggers will be present between 8 PM and 6 am with an estimated completion of 7/1/21. [2020-423/424]

BRADLEY COUNTY I-75 at Exit 33 (SR-308, Lauderdale Highway) bridge work and ramp upgrades: There will be lane shifts in both the Southbound and Northbound lanes from MM 31 to MM33. The lanes will be reduced to 2- 11ft lanes in both directions as work goes on this project. On SR308 (Lauderdale Highway) on Wednesday of this reporting period, there will be intermittent lane closure as the contractor works on the striping in this area for an upcoming change in traffic pattern, weather permitting. RESTRICTIONS: The lanes on this project in both Northbound and Southbound have been reduced to 11 ft. lanes.

[Wright Brothers Construction Company, Inc./Curtis/CNV124]

HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): During this reporting period, the contractor will be working on Market Street (SR-58) and I-24 to remove existing Eastbound entrance ramp. The contractor has closed the ramp to I-24 Eastbound at Long Street and the cloverleaf ramp from Market Street (SR-58) Southbound to I-24 Eastbound. Traffic in these areas accessing I-24 Eastbound will do so via a temporary signal located just south of the I-24 underpass on Market Street (SR-58). Detour signage will be in place. Brief, intermittent lane closures are possible on 25th Street at the intersection of Long Street during daylight hours as the contractor works on the removal of existing entrance ramp. Chestnut Street is closed to thru traffic between West 20th Street and West 25th Street and will remain closed until construction of Bridge No. 2 has been completed.

[Wright Brothers Construction Company, Inc./Wagner/CNU011]

HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Single and double alternating lane closures on I-24 EB and WB will be used on 06/24/21 and between 06/28/21 and 06/30/21 from 9 PM and 6 AM. There will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections of Germantown with North and South Terrace on 06/24/21, 06/25/21, and between 06/28/21 and 06/30/21 from 9 PM and 6 AM. Additionally, from 7 PM on 06/25/21 to 7 AM on 06/28/21 I-24 over Germantown Road will be closed. All eastbound traffic will exit the interstate at Germantown Road (Exit 183), travel along South Terrace, and return to the interstate using a temporary on-ramp. All westbound traffic will exit the interstate using a temporary off-ramp, travel along North Terrace, and return to the interstate using the existing on-ramp at Germantown Road. There will be no access from local streets to the I-24 entrance and exit ramps along this stretch during these interstate closures. Detour routes will be provided online and by way of overhead and portable message boards. There is a 35 MPH speed limit reduction throughout the project corridor on I-24 during the weekend closures.

[Bell and Associates Construction, LP/Blevins/CMGC03]

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 3 traffic alignments have been implemented. Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. The Welcome Center has been reopened. The speed limit has been reduced to 45 MPH throughout the interchange.

[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]

HAMILTON COUNTY US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Monday 06/28/21 – Wednesday 06/30/21 7 AM to 6 PM Temporary Right Shoulder Closure will be in place for Northbound and Southbound US27 from the Olgiati Bridge to I24 For Pull Box Repair. State Trooper Requests: NO

[Dement Construction Company, LLC/Curtis/CNP230]

HAMILTON COUNTY SR-153 (STATE HWY. 153) TDOT Contractor both directions from LM 3.2 to LM 4.75: Nightly lane closures on SR-153 to repair the bridge joints on the bridges over SR-58 and Bonney Oaks.

HAMILTON COUNTY SR-17 (S. WILLOW ST.) Utility Work both directions from LM 2.65 to LM 3.16: Detours will occur on South Willow Ave between Chamberlain Ave and E 16th Street for utility work. Motorists should use caution and be aware personnel and equipment. Barricades, signage, and flaggers will be present between 7 AM and 7 PM with an estimated completion of 7/6/21. [2021-507/543]

HAMILTON COUNTY SR-2 (DODDS AVE.) Utility Work both directions from LM 10.10 to LM 11.33: Lane closures will cause delays on Dodds Avenue between East 23rd Street and McCallie Avenue. Motorists should reduce speed and be prepared to stop or use alternate routes when possible. Signage, cones, barricades, and flaggers will be present between the hours of 7 AM and 7 PM with an estimated completion of 07/06/21. [2019-507]

HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work both directions at LM 9.16: Shoulder and single lane closure between S. Holly Street and S. Highland Park Avenue. Signage and cones will be present. Motorists should use caution and be aware of personnel and equipment between 9 AM and 3 PM through 07/02/21. [2021-111]

HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work both directions at LM 9.82: Shoulder and single lane closure between 4th Avenue and S. Lyerly Street. Signage and cones will be present. Motorists should use caution and be aware of personnel and equipment between 9 AM and 2 PM through 07/02/21. [2020-389]

HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work westbound at LM 8.64: Shoulder and single lane closure between Burnette Street and Fagan Street. Signage and cones will be present. Motorists should use caution and be aware of personnel and equipment between 9 AM and 2 PM through 07/01/21. [2021-402]

HAMILTON COUNTY SR-29 (US-27) TDOT Bridge Inspection both directions from LM 20.3 to LM 20.8: On Tuesday, 06/29/21 from 9 AM to 5 PM, the right (#3) lane will be closed each direction for bridge inspection. Wednesday, 06/30/21, will be used as a backup day due to weather related postponement.

HAMILTON COUNTY SR-8 (MARKET ST.) TDOT Bridge Inspection both directions from LM 9.65 to LM 10.13: 06/29/21 starting at 9AM, the Market Street bridge will be closed both directions to perform the biennial inspection on the truss system.

HAMILTON COUNTY SR-8 (SIGNAL MOUNTAIN RD.) Utility Work northbound at LM 13.45: Shoulder and single lane closure between Mundy Street and Mountain Creek Road. Signage, drums, and cones will be present. Motorists should use caution and be aware of personnel and equipment between 9 AM and 2 PM through 07/02/21. [2021-330]

HAMILTON COUNTY SR-312 resurfacing from south of Henry Road (LM 6.9) to west of SR-58 (LM 14.2): During this reporting period, there will be intermittent lane closures on this road as the Contractor will have flaggers directing traffic for the construction operation. The motoring public should expect possible long delays.

[Wright Brothers Construction Company, Inc./Curtis/CNV087]

HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 06/24/21, 06/25/21, 06/28/21, 06/29/21, and 06/30/21 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.

[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]

HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: Contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place & SR-153 may have lane closures as well. Bridge repair over SR-153 will be performed between 8pm & 6am. During repair operations at least one lane of traffic shall remain open in all directions.

[Mid-State Construction Company, Inc./Osbonlighter/CNV053]

HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading, paving, constructing retaining wall(s) and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. **The roadway is not open to traffic**. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers may be onsite directing traffic.

[Talley Construction Company, Inc./Osbonlighter/CNU221]

MCMINN COUNTY I-75 at SR-30 (Exit 49) and SR-305 (Exit 52) interchange improvements: During this reporting period, the contractor will be working on new turn lanes from SR-305 to the I-75 ramps at exit 52. The shoulders of SR-305 are closed for the duration of this work. Flaggers will be on site between the hours of 6 AM and 10 AM Monday through Friday to assist with concrete pours on the new ramps. Motorists are advised to reduce speed in the work zone and watch for workers on the interstate ramps.

[APAC - Atlantic, Inc./Wagner/CNU352]

POLK COUNTY SR-33 (HWY. 411) Utility Work both directions from LM 9.9 to LM 14: Lane closures between SR-40 and Ocoee River Bridge for utility construction. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present between 9 AM and 3 PM with an estimated completion of 06/30/21. [2019-245]

POLK COUNTY SR-40 (US-64) bridge over the Ocoee River: During this reporting period, the contractor will be working on foundations for the new bridge and relocation of utilities on the east side of the river. The right shoulder of SR-40 (US-64) is closed for the duration of this work. Brief intermittent lane closures are possible on SR-40 (US-64) Monday through Friday 8 AM to 5:30 PM to allow for utility work and moving equipment/supplies. Motorists are advised to reduce speed in the work zone and watch for trucks entering/leaving the highway.

[Charles Blalock and Sons, Inc./Wagner/DB1802]

POLK COUNTY SR-40 (US-64) emergency slope stabilization near LM 20.5: During this reporting period, the contractor will be working on final punch list activities. Brief intermittent lane closures are possible on SR-40 (US-64) Monday through Friday 8 AM to 5:30 PM while the contractor completes this work. Motorists are advised to reduce speed in the work zone and watch for workers on the shoulder of SR-40 (US-64).

[Wright Brothers Construction Company, Inc./Wagner/CNU909]

RHEA COUNTY SR-302 resurfacing from SR-68 (LM 8.9) to near SR-29 (US-27) (LM 12.2): During this report period, the contractor will have temporary lane closures in place while performing resurfacing operations. Flaggers will be present to assist traffic flow.

[Rogers Group, Inc./Osbonlighter/CNV099]

RHEA COUNTY The grading, drainage, construction of bridges, paving and signals on a S.I.A. route serving Nokian Tyres: Construction activity at the Nokian Tyres SIA project continues just North of Dayton, TN. The traveling public should be alert to construction vehicles entering and exiting the site. SR-29 traffic will continue to experience slight lane shifts with no shoulders at the entrance to the SIA roadway but there will be no lane closures on SR29.

[Dement Construction Company, LLC/Curtis/CNU014]

 

REGION WIDE

REGION 2 The random on-call signing on various Interstate and State Routes: During the daytime on 06/21/21 through 06/25/21, the contractor will be setting up shoulder closures at various locations in Sequatchie, Marion, Warren, Coffee, Franklin, and Grundy Counties to install new signs. A truck mounted attenuator will be on site during these closures.

[Superior Traffic Control, LLC/Inc./Voiles/CNU178]

REGION 2 on-call attenuator repair on various Interstate and State Routes: The contractor will be installing a new system in Hamilton County on SR-29 Southbound ramp from Manufactures Road. The contractor may need to utilize a lane closure on the ramp to complete the work. Motorists should use caution in area and watch for workers.

[LU, Inc./Harris/CNU112]

REGION 2 on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor may have short term shoulder and/or lane closures to perform guardrail repair. These closures will take place on the interstate nightly from 7 PM to 6 AM Sundays through Thursdays and daily on state routes. At least one travel lane will always remain open to traffic on the interstate, and flaggers will be present on state routes during any work that is performed.

[Cumberland Guardrail, Inc./Harris/CNU107]

REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed.

[NABCO Electric Company, Inc./Osbonlighter/CNT354]

REGION 2 TDOT Maintenance drainage work: There will be possible short-term lane and shoulder closures at various locations in Region 2 to clean rock and debris from ditches on an as-needed basis. One lane will always be maintained.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 TDOT Maintenance pothole repair and pavement patching: There will be possible short-term emergency lane closures at various locations in Region 2 to repair potholes and patch pavement on an as-needed basis. Depending on location and severity these repairs may be done during the day or at night. In addition to performing the work, regional Operations crews will also provide traffic control.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 TDOT mowing operations: There will be possible short-term lane closures at various locations on interstates and state routes in Region 2 to perform mowing activities on an as-needed basis. In addition to performing the work, regional Operations crews will also provide traffic control.

[TDOT/Maintenance/R2MAINT]

REGION 2 The random on-call cable barrier repair on various Interstate and State Routes: The contractor may have short term shoulder closures to perform cable rail repair. Both travel lanes will always remain open to traffic on the interstate during any work that is performed.

[LU, Inc./Harris/CNU303]

REGION 2 The random on-call pavement marking on various interstate and state routes: Contractor will be retracing pavement markings on various interstate and state routes in Clay, Jackson, Overton, Pickett, Putnam, Dekalb, White, and Cumberland county. Work will be performed using mobile operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.

[Reynolds Sealing and Striping, Inc./James/CNV036]

REGION 2 The sweeping and drain cleaning on various Interstate and State Routes: There will be an area wide sweeping operation on selected regional state routes and interstates. This activity will be supported by a mobile lane closure. Hours of activity are Sunday through Thursday night between 8 PM and 6 AM during this reporting period. The drain cleaning operation will be having intermittent lane closures on SR29(US27), I124(US27), and SR153. The lane closures will from 8 PM to 6 AM Thursday and Monday thru Wednesday of this reporting period.

[Sweeping Corporation of America, Inc./Curtis/CNU328]

 

RESTRICTIONS

CLAY COUNTY - CNU198: Loads wider than 11' should seek alternate route.

BLEDSOE COUNTY - CNV003: Loads wider than 15' should seek alternate route.

SEQUATCHIE COUNTY - CNU148: Loads wider than 15 feet should seek alternate routes.

BRADLEY COUNTY - CNV124: The lanes on this project in both Northbound and Southbound have been reduced to 11 ft. lanes.

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.

Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. All times are local.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or Chattanooga area alerts @Chattanooga511 or any of TDOT's other Twitter pages. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don't want to lose another member of our TDOT family. We're asking you to WORK WITH US. To learn more, go to the website at https://www.tn.gov/tdot/work-with-us/.

###

 

Adblock test (Why?)



"activity" - Google News
June 24, 2021 at 10:49PM
https://ift.tt/3h22StJ

Roadway Activity Report for TDOT Region 2 (June 24 - 30, 2021) - tn.gov
"activity" - Google News
https://ift.tt/3ddCXMh
https://ift.tt/2WkO13c

Bagikan Berita Ini

0 Response to "Roadway Activity Report for TDOT Region 2 (June 24 - 30, 2021) - tn.gov"

Post a Comment

Powered by Blogger.