DISTRICT 27
CUMBERLAND COUNTY I-40 resurfacing from the SR-101 ramp (MM 321) to east of SR-1 (US-70) (MM 329): Bridge repairs are planned for the I-40 Daddy's Creek Bridges in Cumberland County during this week. Twenty-four-hour lane closures will be required on I-40 in both the eastbound and westbound directions near MM 326. One lane will remain open in each direction with traffic control in place to assist motorists.
[Rogers Group, Inc./Bradley/CNT364]
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): Construction signs have been installed with erosion control activities and clearing on-going. The contractor has begun road and drainage activities which may require some drilling and blasting. Utility relocations for gas, water, sewer, and electric are in progress. Temporary lane closures or traffic stoppages will be necessary as construction activities continue. Motorists should use caution while traveling through the work zone.
[Jones Bros. Contractors, LLC/Bradley/CNV009]
CUMBERLAND COUNTY I-40 TDOT Bridge Inspection both directions at MM 318: Bridge inspection will be performing its 2-year inspection on the I-40 Bridge over the Obed River at MM 318 on Thursday, 10/28/21, from 8:00 am until 2:00 pm.
CUMBERLAND COUNTY SR-298 (GENESIS RD.) Utility Work both directions from LM 0.17 to LM 1.68: Mobile lane closures will occur along SR-298 between I-40 and Industrial Blvd. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Support vehicles, signage, and flaggers will be present between 9:00 AM and 2:30 PM starting 10/07/21 through 11/03/21. [2021-648]
CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Construction signs are installed. The contractor is installing erosion control measures ahead of road and drainage activities. Utility relocation activities for gas, water, and sewer are in progress. Construction activities may require temporary lane closures and/or traffic stoppages.
[Rogers Group, Inc./Bradley/CNV010]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor has begun clearing operations, installing erosion control measures, and water and gas line relocation. Intermittent lane closures and flagging operations are expected. Intermittent blasting operation has begun resulting in temporary road closures. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.
[Twin K Construction/James/CNV012]
DEKALB AND WARREN COUNTY SR-56 construction of bridges and paving from south of Warren-Dekalb county line (LM 24.5) to East Bryant St. (LM 2.9): The contractor will continue installing concrete box culverts and drainage structures. Grade work, bridge work, paving operations, and utility work on the new roadway alignment are ongoing. Traffic is still using the existing SR-56; however, motorists are advised to use caution and watch for construction equipment adjacent to roadway. Flaggers may be present to move equipment across roadway, unload equipment, or complete utility work. The contractor is currently performing grade work at various locations throughout the project. A traffic shift in Smithville will remain from Vaughn Lane to the end of project to allow for the contractor to complete work. There will be a temporary diversion for Ferrell Rd, and one remains in place for Williams Road to allow contractor to construct new alignment. The speed limit has been reduced to 45 mph in the construction zone. Motorists should use caution in this area and watch for flaggers and construction equipment.
[Jones Bros. Contractors, LLC/Harris/CNT011]
FENTRESS COUNTY SR-28 (US-127) resurfacing from north of SR-52 (LM 19.8) to north of Kip Chase Rd (LM 23.1) and SR-154 from Millsap Ave (LM 1.4) to east of Louvaine Rd (LM 6.3): The contractor is continuing resurfacing work on SR-28 and is also performing resurfacing work on SR-154. During this work, the contractor will shut down a lane in each direction and will have flaggers control the flow of traffic through the work zone. Motorists are encouraged to use caution as they approach the work zone and should be prepared to stop.
[Rogers Group, Inc./Moore/CNV152]
OVERTON COUNTY SR-111 resurfacing from south of East Volunteer Dr (LM 9.4) to SR-294 (LM 14.0) and on SR-52 from near SR-111 (LM 10.2) to north of SR-52/SR-85 (LM 11.0): The contractor will be performing paving operations daily from 8:00 AM to 2:00 PM and from 3:30 PM to 6:00 PM. During this time, the contractor will have one lane closed on SR-111 and flaggers will be utilized to control the flow of traffic through the work zone. The contractor will also be paving on SR-52 during the same time frame and will have one lane shut down on that route. Flaggers will be used to control the flow of traffic through the work zone. Motorists are encouraged to use caution through the work zone and to be prepared to stop.
[Rogers Group, Inc./Moore/CNV181]
PICKETT COUNTY SR-111 (HWY. ONE ELEVEN) TDOT Bridge Inspection both directions at LM 9.6: Bridge inspection will be performing its 2-year inspection on the SR-111 Bridge over the Wolf River at LM 9.67 on Tuesday, 11/2/21, from 8:00 am until 2:00 pm.
PICKETT COUNTY SR-111 (LIVINGSTON HWY.) TDOT Bridge Inspection both directions at LM 3.21: Bridge inspection will be performing its 2-year inspection on the SR-111 Bridge over the Obey river at LM 3.21 on Monday, 11/01/21, from 8:00 am until 2:00 pm.
PUTNAM COUNTY I-40 EB bridge repair and resurfacing from west of Falling Water River Bridge (MM 291) to the ramp from SR-24 (US-70N / MM 300): The contractor will be performing nightly lane closures Sunday through Friday from 7:00 PM – 6:00 AM. The contractor will be installing pavement markings throughout project. Bridge repair work will also result in a continuous lane closure at MM 291.2 Eastbound from Sunday 10/31/21 at 7:00 PM through Wednesday 11/3/21 at 7:00 AM. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.
[Rogers Group, Inc./James/CNU358]
PUTNAM COUNTY SR-56 repair of the bridge over I-40 (LM 0.5): The contractor has placed barrier rail on SR-56 and the signal is now in operation. SR-56 will be shut down to one lane and will remain one lane for the duration of the project until 11/30/21. Motorists are encouraged to use caution and be prepared to stop as they approach the work zone.
[Mid-State Construction Company, Inc./Moore/CNV279]
PUTNAM COUNTY SR-135 (Burgess Falls Road) grading, drainage, signals and paving at the intersection of West Cemetery Road (LM 6.6): The contractor will be installing traffic signal equipment along SR-135 and West Cemetery Road, resulting in daily lane closures. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.
[Rogers Group, Inc./James/CNU270]
PUTNAM COUNTY SR-24 (US-70N) slide repair near LM 30.1: The contractor has installed barrier rail and will continue retaining wall construction. Traffic will be reduced to one lane and controlled by temporary traffic signals at each end of the project. Be prepared to stop when traveling through the work zone.
[Rogers Group, Inc./James/CNU359]
PUTNAM COUNTY SR-290 resurfacing from Shipley Road (LM 1.6) to SR-135 (LM 6.4): The contractor will be milling existing asphalt and continuing ADA ramp construction. This will result in daily lane closures along SR-290. Motorists should be prepared to stop and be aware of all construction equipment and personnel.
[Rogers Group, Inc./James/CNV231]
PUTNAM AND WHITE COUNTY SR-111 resurfacing from south of Overpass Road (LM 13.5) in White County to north of SR-136 (LM 2.0) in Putnam County: The contractor will be resurfacing the roadway throughout the project and installing pavement markings, resulting in daily lane closures. Motorists should be aware of all construction equipment and personnel when traveling through the work zone.
[American Pavements, Inc./James/CNV122]
DISTRICT 28
BLEDSOE COUNTY SR-28 (US-HWY. 127) Utility Work both directions from LM 5.82 to LM 13.7: Mobile lane closures will occur between the intersection of SR-127 & SR-30 and ending at intersection of SR-127 & College Station Mtn Road. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present between 9 AM and 2 PM with an estimated completion of 02/20/22. [2021-493]
BLEDSOE COUNTY SR-30 bridge repair over the Sequatchie River (LM 10.36): The contractor will be working on SR-30 on the bridge over the Sequatchie River. The lanes have been reduced to 10 feet wide so please use caution when traveling through the area. RESTRICTIONS: No loads over 10 feet wide.
[Jamison Construction, LLC/Voiles/CNV003]
CANNON AND WARREN COUNTY SR-1 (US-70S) bridge repair and paving from east of Lincoln Lane (LM 11) in Cannon County to Robinson Road (LM 9.4) in Warren County: The contractor will set up daily lane closures on SR-1 for the construction of ADA ramps, micro-surfacing, and painting. Motorists should use caution and be aware of construction equipment and personnel.
[American Pavements, Inc./Harris/CNV075]
COFFEE COUNTY I-24 resurfacing from near the SR-55 ramp (MM 111) to near Arnold Center Road (MM 118): Project activity will continue from 7:00 PM to 6:00 AM. The roadway will be reduced to one lane nightly both directions to support operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone and be prepared to reduce speeds while approaching the work zone located between Coffee County MM 111 to MM 118, the posted speed limit has been reduced from 70 MPH to 60 MPH within the work zone.
[Wright Paving Contractors, Inc./Hussein/CNU338]
COFFEE COUNTY SR-2 (US-41) at SR-55 (McMinnville Highway) intersection improvements in Manchester (LM 14.65), and installation of interchange lighting on I-24 at the junction of SR-55 (LM 14.06 - LM 14.74): Project activities continue daily with various roadway construction activities being performed. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.
[Rogers Group, Inc./Hussein/CNU006]
FRANKLIN COUNTY SR-15 (US-41) intersection improvement at University Avenue (LM 27.9): Project activities continue daily. The roadway will be reduced from 4-lanes to 2-lanes. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.
[Dement Construction Company, LLC/Hussein/CNV062]
FRANKLIN COUNTY SR-50 construction of a small drainage structure at (LM 7.6): Project activities continue daily. The roadway will be reduced to one lane controlled by traffic signal operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone and be prepared to stop while approaching the work zone located at LM 7.6, the posted speed limit has been reduced from 40 MPH to 25 MPH within the work zone.
[Dement Construction Company, LLC/Hussein/CNV062]
GRUNDY COUNTY SR-2 (US-41) safety improvements from near the Elk River Bridge (LM 2.3) to the Monteagle city limits (LM 7.6) and on SR-108 from near Gap Road (LM 21.5) to near Basham Road (LM 24.0): Flaggers will be present for sign installation on SR-2 and SR-108. Motorists should use caution in the area and watch for flaggers and equipment.
[LU, Inc./Harris/CNV219]
GRUNDY COUNTY SR-56 resurfacing from near SR-50 (LM 20.2) to north of Hege Avenue (LM 25.8): Project activities continue daily. The roadway will be reduced to one lane during construction work, both lanes will be restored by the end of each day. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.
[Rogers Group, Inc./Hussein/CNV085]
GRUNDY COUNTY SR-56 slide repair between LM 26.3 and LM 26.6: The road will remain one lane controlled by a temporary traffic signal while contractor completes slide repairs in the area. Motorists should use caution in the area and watch for flaggers and equipment.
[Dement Construction Company, LLC/Harris/CNU355]
MARION COUNTY SR-156 (SOUTH PITTSBURG MTN. RD.) Utility Work both directions from LM 5.97 to LM 5.95: Shoulder and single lane closures along SR-156. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 09/27/21 through 11/03/21 from 9 am – 2 pm. [2021-441]
MARION COUNTY SR-27 resurfacing from south of Richards Lane (LM 16.6) to east of Smith Cemetery Road (LM 18.4): The contractor will be performing paving operations using single lane closures controlled by flaggers. Please use caution when driving through the construction zone.
[Tinsley Asphalt, LLC /Voiles/CNV174]
MARION COUNTY The S.I.A. route serving Northeast Wood Products in Jasper: The contractor will have intermittent lane closures to perform shoulder and ditch improvements. The lane closures will be controlled by flaggers. Please use caution when driving through the area.
[Tinsley Asphalt, LLC /Voiles/CNV901]
SEQUATCHIE COUNTY SR-8 (SR-111) resurfacing from the SR-8/SR-111 overpass (LM 17.6) to near Old Union Road (LM 18.7): The contractor will be setting up single lane closures to perform paving operations. Please use caution and follow construction signs when driving through the work zone.
[Tinsley Asphalt, LLC /Voiles/CNV174]
DISTRICT 29
BRADLEY COUNTY I-75 resurfacing from north of SR-60 (MM 25) to south of SR-308 (MM 31): During this reporting period the contractor will have nightly lane closures from 7:00 PM to 6:00 AM to support resurfacing operations and the placement of final pavement markings. The speed limit has been reduced to 60 mph in the work zone.
[Wright Brothers Construction Company, Inc./Wagner/CNU335]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will be installing construction signage and message boards throughout the project limits. Brief, intermittent lane closures are possible on SR-60 during daylight hours as this work occurs. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Wagner/CNV130]
BRADLEY COUNTY SR-2 (KEITH ST. S.W.) Utility Work southbound from LM 8.57 to LM 9.24: Lane closures between Fairway Drive SW and Harrison Pike. Signage and barrels will be present. Motorists should reduce speed and use caution through the work zones between the hours of 9 am - 2 PM during the daytime and 8:00 PM – 6:00 AM during the nighttime. [2020-423/424]
BRADLEY COUNTY SR-308 (LAUDERDALE MEMORIAL HWY.) Utility Work westbound from LM 5.43 to LM 6.62: Mobile lane closures between Walker Valley Road and Wacker Blvd for utility construction. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present between 9:00 AM and 3:00 PM with an estimated completion of 11/10/21. [2021-404]
BRADLEY COUNTY SR-312 (HARRISON PK.) Utility Work both directions from LM 8.42 to LM 8.48: A detour of Harrison Pike at Keith Street will cause short delays as traffic is routed along Grove Avenue during utility construction. Motorists should reduce speed and follow signage. Barricades, cones, and flaggers will be present between 8:00 PM and 6:00 am with an estimated completion of 11/17/21. [2020-423/424]
BRADLEY COUNTY SR-74 (OCOEE ST. N.E.) Utility Work both directions from LM 16.26 to LM 16.28: Shoulder and single lane closures between Westview Drive NW and Keith Street NW. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 10/14/21 through 11/10/21 from 9:00 am – 2:00 pm. [2020-193]
BRADLEY COUNTY I-75 at Exit 33 (SR-308, Lauderdale Highway) bridge work and ramp upgrades: There will be lane shifts in both directions from MM 31 to MM 33. The lanes will be reduced to two 11-foot lanes in both directions as work goes on this project. On SR-308 (Lauderdale Highway) there will be intermittent lane closures as the contractor works in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNV124]
HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): During this reporting period the contractor will be working on new bridge construction, retaining wall construction, and the placement of new overhead signs. Beginning Monday 11/01/21 through Thursday 11/04/21 at 9 PM to 6 AM daily the contractor will close the left (#1) lane of I-24 Westbound to support the construction of foundations for new overhead signs. Chestnut street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted.
[Wright Brothers Construction Company, Inc./Wagner/CNU011]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: The contractor is working on final striping throughout project. Single and double alternating lane closures on I-24 EB and WB are planned from 9 PM and 6 AM Sunday nights through Thursday nights to accommodate striping activities. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: All roadways and ramps are in their final alignments. The contractor is now working on final items and traffic should still use caution traveling throughout the interchange. The final work items will mostly consist of off shoulder work/median work. Additionally, lane closures may still occur Sunday nights through Thursday nights between 9 PM and 6 AM to finish in roadway items. The speed limit will remain reduced to 45 MPH throughout the interchange until construction crews demobilize.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY SR-153 (STATE HWY. 153) Utility Work both directions from LM 7.7 to LM 8.9: Nighttime shoulder and lane closure between Chickamauga Dam and Hixson Pike Overpass. Motorists should reduce speed and be prepared to stop. Caution vehicles, signage, drums, and flaggers will be present 10/04/21 through 11/10/21 between 10 pm and 6 am. [2021-558]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 12.01: Shoulder and multi-lane closures both North and South bound directions between McConnell School Road and Dallas Hollow Road. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 10/28/21 through 11/12/21 from 9:00 am – 2:00 pm. [2021-590]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. Flagging operations will also be required on Tucker Road for dump trucks hauling fill dirt. The flagging operations will be performed on 10/27/21, 10/28/21, 10/29/21, 11/02/21, and 11/03/21 from 7:00 AM to 1:00 PM and 3:00 PM to 7:00 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. The contractor is planning to flag traffic on a single lane of Tallant Road to finish the final portion of the roundabout in the upcoming weeks.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: The contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place & SR-153 may have lane closures as well. During repair operations at least one lane of traffic shall remain open in all directions.
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY SR-58 resurfacing from north of Sims Road (LM 17.4) to south of SR-60 (LM 26): During the report period, one lane will be temporarily closed. There will be one lane open for traffic. Flaggers will be on site.
[Asphalt Paving Systems, Inc./Osbonlighter/CNV156]
HAMILTON COUNTY SR-8 (US-41 / US-76) resurfacing from east of East 29th St to SR-2 (US-11 / US-64) and on SR-2 (US-11 / US-64) from SR-8 (US-41 / US-76) to near the Missionary Ridge Tunnel: During this reporting period, there will be intermittent lane closures on Dobbs Avenue as the contractor works. Also, there will be intermittent lane closures on Westside Drive as the contractor works in these areas. The contractor will be closing portions of the sidewalk as they are working to install curb ramps. There will be signed sidewalk detours as this work is being performed.
[Talley Construction Company, Inc./Curtis/CNV155]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. **The roadway is not open to traffic**. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers may be onsite directing traffic. Traveling public should be cautious of new traffic pattern in effect.
[Talley Construction Company, Inc./Osbonlighter/CNU221]
MCMINN COUNTY I-75 at SR-30 (Exit 49) and SR-305 (Exit 52) interchange improvements: During this reporting period the contractor will have right lane closures in place on SR-30 at I-75 Exit 49 to support the resurfacing of SR-30 and the installation of new traffic signals. Motorists are advised to reduce speed and watch for workers and equipment on the interstate ramps at both exits 49 and 52.
[APAC - Atlantic, Inc./Wagner/CNU352]
MCMINN COUNTY SR-163 (ETOWAH RD.) TDOT Bridge Inspection both directions at LM 11.7: Bridge inspection will be providing bridge access equipment to a contractor to collect samples on the SR-163 Bridge over Chestuee Creek at LM 11.7 on Tuesday, 11/2/21, from 8 am until 2 pm.
MCMINN COUNTY SR-2 (US-11) resurfacing from near the Hiwassee River bridge (LM 0.0) to near County Road 135 (LM 7.3): During this reporting period, the contractor will have lane closures daily from 8:00 AM to 5:30 PM to support resurfacing operations. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Patty Construction Inc./Wagner/CNV025]
MCMINN COUNTY SR-33 (US-411) resurfacing from Pine Street (LM 5.0) to the Monroe County line (LM 9.5): During this reporting period, there will be intermittent lane closures on SR-33(US-411) in both North and Southbound lanes as the contractor works.
[Rogers Group, Inc./Curtis/CNV239]
MEIGS COUNTY SR-304 resurfacing from north of SR-68 (LM 8.8) to the Roane County line (LM 16.9): During this report period the contractor will be performing milling and paving operations. Flaggers and a pilot vehicle will be assisting with traffic management.
[Rogers Group, Inc./Osbonlighter/CNV177]
POLK COUNTY SR-30 TDOT Contractor both directions from LM 5.67 to LM 5.76: Polk SR-30 will be reduced to a single lane at LM 5.6 to LM 5.8 due to a landslide. A temporary traffic signal is in place at this location to assist with traffic control. The Contract is planning on mobilizing on 11/01/21.
[TDOT/Wagner/MAINT]
POLK COUNTY SR-40 (US-64) bridge over the Ocoee River: During this reporting period, the contractor will be working on the construction of portions of the new bridge and the relocation of sewer and water lines. The contractor will be working to set steel girders on the new bridge. Brief intermittent lane closures are possible on US-64 (SR-40) Monday through Friday 8:00 AM to 5:30 PM as the contractor works to relocate utility lines on the project. Motorists are asked to reduce speed in the work zone and watch for trucks entering/leaving the highway.
[Charles Blalock and Sons, Inc./Wagner/DB1802]
POLK COUNTY SR-68 resurfacing from the Monroe County line (LM 0.0) to Waller Road (LM 6.2): During this reporting period, the contractor will have lane closures daily from 8 AM to 5:30 PM to support resurfacing operations. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[APAC - Atlantic, Inc./Wagner/CNV200]
RHEA COUNTY SR-29 (US-27) resurfacing from near Welch St (LM 6.9) to north of Payne Lane (LM 11): During this reporting period, there will be intermittent lane closures during the day as the contractor works on the sidewalks and curb ramps.
[Rogers Group, Inc./Curtis/CNV182]
RHEA COUNTY SR-378 resurfacing from SR-29 (US-27 / LM 0.0) to west of SR-29 (US-27 / LM 1.61) and SR-30 from east of Railroad Street (LM 8.7) to near SR-29 (US-27 / LM 9.2): During this reporting period, there will be intermittent lane closures on both SR-378 and SR-30 during the day as the contractor works on this project. Expect possible long delays as flaggers will be directing traffic on this project.
[Rogers Group, Inc./Curtis/CNV100]
RHEA COUNTY The grading, drainage, construction of bridges, paving and signals on a S.I.A. route serving Nokian Tyres: Construction activity at the Nokian Tyres SIA project continues just North of Dayton, TN. The traveling public should be alert to construction vehicles entering and exiting the site. SR-29 traffic will continue to experience slight lane shifts with no shoulders at the entrance to the SIA roadway but there will be no lane closures on SR-29.
[Dement Construction Company, LLC/Curtis/CNU014]
REGION WIDE
REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed.
[NABCO Electric Company, Inc./Osbonlighter/CNT354]
REGION 2 TDOT Maintenance drainage work: There will be possible short-term lane and shoulder closures at various locations in Region 2 in order to clean rock and debris from ditches on an as-needed basis. One lane will be maintained at all times.
[TDOT Operations/Maintenance/R2MAINT]
REGION 2 TDOT Maintenance pothole repair and pavement patching: There will be possible short-term emergency lane closures at various locations in Region 2 in order to repair potholes and patch pavement on an as-needed basis. Depending on location and severity these repairs may be done during the day or at night. In addition to performing the work, regional Operations crews will also provide traffic control.
[TDOT Operations/Maintenance/R2MAINT]
REGION 2 TDOT mowing operations: There will be possible short-term lane closures at various locations on interstates and state routes in Region 2 in order to perform mowing activities on an as-needed basis. In addition to performing the work, regional Operations crews will also provide traffic control.
[TDOT/Maintenance/R2MAINT]
REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor may have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly from 7 PM to 6 AM Sundays through Thursdays and daily on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
[Cumberland Guardrail, Inc./Harris/CNV112]
REGION 2 The random on-call signing on various Interstate and State Routes: During the daytime, the contractor will be setting up shoulder closures at various locations in Grundy County on SR-56, Marion County on SR-2, and Franklin County on SR-156 and SR-15. The contractor will be installing new concrete footers for signs. A truck mounted attenuator will be on site during these closures.
[Superior Traffic Control, LLC/Inc./Voiles/CNV194]
REGION 2 Crack sealing at various locations on various state routes: During this reporting period the contractor will have intermittent lane closures in Warren County on SR-55 from LM 0.00 to LM 1.09, SR-127 from LM 1.09 to LM 9.28, SR-136 from LM 0.00 to LM 2.04, and SR-287 from LM 14.32 to LM 27.87. Intermittent lane closures will also be possible in Coffee County on SR-55 from LM 19.28 to LM 24.55 and SR-64 from LM 0.00 to LM 6.35. Motorists are asked to reduce speed in the work zone.
[Pavement Restorations, Inc./Wagner/CNV114]
REGION 2 on-call concrete pavement repair on various interstates and state routes: The contractor will be repairing concrete pavement on the SR-24 on-ramp to SR-111 SB in Cookeville. The contractor will be pulling out concrete slabs and pouring fresh concrete back. Half the width of the ramp will be closed during construction. Please slow down and use caution when driving through the work zone.
[Vulcan Construction Materials, LLC/Voiles/CNU373]
REGION 2 The random on-call cable barrier repair on various Interstate and State Routes: The contractor may have short term shoulder closures in order to perform cable rail repair. Both travel lanes will always remain open to traffic on the interstate during any work that is performed.
[LU, Inc./Harris/CNU303]
REGION 2 The relensing of snow plowable pavement markers on various interstates and state routes: The contractor will be replacing reflective marker lenses on various interstate and state routes in Bradley, McMinn, and Meigs Counties. Work will be performed using mobile operations. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.
[W.L. Markers Inc./James/CNV037]
REGION 2 The sweeping and drain cleaning on various Interstate and State Routes: There will be an area wide sweeping operation on selected regional state routes and interstates. This activity will be supported by a mobile lane closure. Hours of activity are Sunday through Thursday night between 8 PM and 6 AM during this reporting period.
[Sweeping Corporation of America, Inc./Curtis/CNU328]
RESTRICTIONS
BLEDSOE COUNTY - CNV003: No loads over 10 feet wide.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. All times are local.
From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or Chattanooga area alerts @Chattanooga511 or any of TDOT's other Twitter pages. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.
In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don't want to lose another member of our TDOT family. We're asking you to WORK WITH US. To learn more, go to the website at https://www.tn.gov/tdot/work-with-us/.
###
"activity" - Google News
October 29, 2021 at 02:56AM
https://ift.tt/3EqClAt
Roadway Activity Report for parts of East and Middle Tennessee (October 28 - November 3, 2021) - tn.gov
"activity" - Google News
https://ift.tt/3ddCXMh
https://ift.tt/2WkO13c
Bagikan Berita Ini
0 Response to "Roadway Activity Report for parts of East and Middle Tennessee (October 28 - November 3, 2021) - tn.gov"
Post a Comment